Alberta Electric System Operator | |
System Co-ordination Plan | |
2023-11-23 to 2023-12-01 | |
Approved Outages |
Previous Version | |
Download CSV |
From | To | Owner | Type | Element | Scheduled Activity | Date/Time Comments | Interconnection |
---|---|---|---|---|---|---|---|
05-Oct-18 08:00 | 31-Dec-23 16:00 | EPCOR | IO | C2 (Rossdale) | forced outage | Continuous |
1,913.38 Days
|
24-Oct-18 01:13 | 31-Dec-23 16:00 | EPCOR | IO | C1 (Rossdale) | forced outage | 1,894.66 Days
Continuous |
|
14-Mar-22 14:00 | 31-Dec-23 18:00 | ATCO | TE | 813s SVC (813s Little Smoky) | emergency real time failed relay | 657.21 Days
Continuous |
|
04-Sep-22 16:50 | 30-Sep-24 18:00 | ATCO | Outage | 848s 401R (848s Ruth Lake) | forced outage | 757.05 Days
Continuous |
|
15-Mar-23 18:01 | 01-Mar-24 18:00 | SUNCOR | Outage | 29EDD-71 752-4651 (29EDD-71) | breaker will remain offline for undetermined period of time | 352.04 Days
Continuous |
|
17-May-23 17:01 | 30-Nov-23 17:00 | EPCOR | Outage | 72RG7 (Garneau - Rossdale), G722 (Garneau), G723 (Garneau) | faulted cable | 197.04 Days
Continuous |
|
29-May-23 08:20 | 12-Jan-24 23:00 | ATCO | Outage | 840s McNeill Station | filter bank forced outage | 228.65 Days
Continuous |
AB-SK |
05-Jun-23 07:00 | 22-Dec-23 17:00 | EPCOR | Outage | 805s C1 (805s Jasper), EP 805s J2408 (EP 805s Jasper) | Jasper: Emergency Investigation of J2408 Cap Bank Breaker | 200.46 Days
Continuous |
|
12-Jun-23 00:00 | 31-Mar-24 00:00 | ATCO | Outage | 7L64 (747s Bassett - 930s Arcenciel) | forced outage due to fire | 293 Days
Continuous |
|
12-Jun-23 10:00 | 29-Dec-23 17:00 | ATCO | TE | 766s RTU/SCADA (766s Nevis) | nevis upgrade project
|
200.33 Days
Continuous |
|
23-Jun-23 10:00 | 24-Nov-23 17:00 | ATCO | Outage | 822s 701T (822s Wolf Lake), 822s 704 (822s Wolf Lake) | P&C and SCADA upgrade
|
154.33 Days
Continuous |
|
23-Jun-23 17:01 | 15-Jan-24 17:00 | EPCOR | Outage | T3 (Garneau) | TX3 LCR construction | 206.04 Days
Continuous |
|
04-Jul-23 13:00 | 29-Mar-24 17:30 | ATCO | IO | 840s McNeill Station | PQM at 840s McNeill to investigate voltage transients and harmonics | 269.19 Days
Continuous |
|
10-Jul-23 10:00 | 04-Dec-23 17:00 | ATCO | TE | 766S 144kV Bus Protection, 766S 240kV Bus Protection | 766S Nevis Rebuild Project - 144kV and 240kV Bus protections OOS for duration of project | 147.33 Days
Continuous |
|
10-Jul-23 10:00 | 04-Dec-23 17:00 | ATCO | TE | 766s Protection & Control (766s Nevis) | 766S Nevis Rebuild Project | 147.33 Days
Continuous |
|
24-Jul-23 09:00 | 15-Dec-23 17:30 | ATCO | TE | 766s Protection & Control (766s Nevis) | modify protections for 901T replacement project | 144.4 Days
Continuous |
|
25-Jul-23 11:01 | 04-Dec-23 17:00 | ATCO | Outage | 766s 901T (766s Nevis) | 766S Nevis Rebuild Project | 132.29 Days
Continuous |
|
31-Jul-23 14:56 | 14-Dec-23 16:00 | ENMAX | Outage | 38B138-38.1CAP (SS-38), 38.1C (SS-38) | motor run time fail | 136.09 Days
Continuous |
|
12-Aug-23 18:00 | 28-Nov-23 10:00 | ALTALINK | Outage | 29s T2 (29s Cascade) | cutover and energize new 177s switchgear | 107.71 Days
Continuous |
|
21-Aug-23 17:01 | 04-Dec-23 17:00 | ATCO | IO | 766s 144kV Bus (766s Nevis) | connect new 704A to the 144 kV bus, work still required to install new 903T and 704 to connect to 704A | 105.04 Days
Continuous |
|
22-Aug-23 09:30 | 29-Nov-23 17:30 | ATCO | TE | 848s RTU/SCADA (848s Ruth Lake), 848s Protection & Control (848s Ruth Lake) | Suncor capacity increase project - RTU upgrades |
99.38 Days
Continuous |
|
01-Sep-23 20:00 | 31-Mar-24 17:00 | ATCO | Outage | 7L113 (853s Ring Creek - 930s Arcenciel) | forced outage | 211.88 Days
Continuous |
|
08-Sep-23 09:30 | 14-Dec-23 17:30 | ATCO, SUNCOR | Outage | 29PL9-1 (29EDD-1 Millennium - 848s Ruth Lake), 848s 903 (848s Ruth Lake), 848s 906 (848s Ruth Lake) | reconductor 29PL9-1 (Suncor Capacity Increase project) | 97.38 Days
Continuous |
|
20-Sep-23 10:00 | 04-Dec-23 17:00 | ATCO | Outage | 766s 240kV Bus (766s Nevis), 766s 901 (766s Nevis), 766s 902 (766s Nevis) | replace and commission equipment as part of Nevis rebuild project | 75.33 Days
Continuous |
|
25-Sep-23 07:00 | 29-Feb-24 17:00 | EPCOR | TE | 330p RTU/SCADA (330p Genesee) | Genesee re-powering project work | 157.46 Days
Continuous |
|
05-Oct-23 11:30 | 30-Nov-23 18:00 | ATCO | Outage | 6L12 (774s Monitor - 6L25 tap), 774s 601 (774s Monitor), 774s 701T (774s Monitor), 774s 707 (774s Monitor) | forced out | 56.31 Days
Continuous |
|
09-Oct-23 07:00 | 08-Dec-23 16:00 | ALTALINK | TE | 368s Protection & Control (368s Burdett) | upgrade the A87/138B relay | 60.42 Days
Continuous |
|
10-Oct-23 09:00 | 24-Nov-23 17:00 | ATCO | TE | 802s Protection & Control (802s Michichi Creek) | relay settings updates and commissioning | 45.38 Days
Continuous |
|
10-Oct-23 23:00 | 25-Nov-23 17:00 | ALTALINK | Outage | 62s 12 (62s Brazeau Plant) | maintenance | 45.79 Days
Continuous |
|
16-Oct-23 09:00 | 28-Nov-23 17:00 | ALTALINK | TE | 368s RTU/SCADA (368s Burdett), AltaLink Distribution Switch | supervisory visibility outages may be required to download new configurations | 43.38 Days
Continuous |
|
18-Oct-23 07:00 | 01-Feb-24 17:00 | EPCOR | Outage | 987s CDS33 (987s Cloverbar) | continued re-configuration of 240 kV ring for new 1191L bay construction will leave the ring open from newly energized CDS41 and CDS44 disconnects. | 106.46 Days
Continuous |
|
18-Oct-23 07:00 | 11-Dec-23 17:00 | ATCO | TE | 885s Protection & Control (885s McMillan) | 885S protection upgrade | 54.46 Days
Continuous |
|
23-Oct-23 07:30 | 18-Dec-23 17:30 | ALTALINK | RB | 983L (244s Bowmanton - 983L tap), 983L (251s Whitla - 983L tap), 983AL (1019s Woolchester - 983L tap) | tying in the new 326s Murray Lake substation | 56.46 Days
Daily |
|
23-Oct-23 08:00 | 28-Nov-23 16:00 | ENMAX | Outage | 2.82L (SS-2 - SS-5), 5B138-2.82 (SS-5) | facilitate future 2.82L double circuit configuration | 36.38 Days
Continuous |
|
23-Oct-23 09:00 | 18-Dec-23 17:00 | ALTALINK | TE | 244s Protection & Control (244s Bowmanton) | update settings and test | 56.38 Days
Daily |
|
23-Oct-23 09:00 | 18-Dec-23 17:00 | ALTALINK | TE | 244s Protection & Control (244s Bowmanton) | removing 244s AIS 1143 'A' & 'B' one at a time to update settings and test | 56.38 Days
Daily |
|
23-Oct-23 12:00 | 18-Dec-23 15:00 | ATCO | TE | 873s RTU/SCADA (873s Marion Lake), 873s Protection & Control (873s Marion Lake) | replacing 601T transformer, and upgrading protection with new protection panels and relays | 56.17 Days
Continuous |
|
28-Oct-23 08:00 | 11-Jan-24 16:00 | ENMAX | Outage | 16.61L (SS-16 - SS-27), 16B69-16.61 (SS-16), 27B69-16.61 (SS-27) | Line rebuild | 75.38 Days
Continuous |
|
28-Oct-23 08:00 | 27-Nov-23 17:00 | ATCO | TE | ATCO RTU/SCADA | upgrade RTU | 30.42 Days
Continuous |
|
29-Oct-23 07:15 | 30-Nov-23 17:45 | ALTALINK | Outage | 858L (40s Wetaskiwin - 289s Saunders Lake) | replace structures within 48 - 188 and perform structure maintenance within 1 - 235. | 32.48 Days
Continuous |
|
30-Oct-23 10:00 | 12-Feb-24 17:30 | ATCO | TE | 885s RTU/SCADA (885s McMillan) | protection upgrade at McMillan. |
105.35 Days
Continuous |
|
30-Oct-23 11:00 | 27-Nov-23 12:00 | ATCO | Outage | 885s 704 (885s McMillan), 885s 902T (885s McMillan), 885S 702TD (885s McMillan) | protection upgrade | 28.08 Days
Continuous |
|
31-Oct-23 08:00 | 17-Jan-24 16:00 | ENMAX | Outage | 1.82L (SS-1 - SS-5), 5B138-1.82 (SS-5) | 1.82L duct bank and electrical tie in | 78.38 Days
Continuous |
|
31-Oct-23 08:00 | 17-Jan-24 16:00 | ENMAX | Outage | 1.84L (SS-1 - SS-5) | 1.84L breaker only outage for initial 1.82L duct bank tie in | 78.38 Days
Continuous |
|
31-Oct-23 09:00 | 11-Dec-23 12:00 | ATCO | TE | 855s Protection & Control (855s Hamburg) | open PT disconnects for isolation | 41.17 Days
Continuous |
|
01-Nov-23 07:30 | 14-Jan-24 17:30 | ALTALINK | RB | 922L (17s Benalto - 310p Sundance) | recloser block required due to common tower with 926L | 74.46 Days
Continuous |
|
01-Nov-23 08:00 | 23-Nov-23 18:00 | SUNCOR | TE | 29EDD-1 RTU/SCADA (29EDD-1 Millennium) | BP-29PL9-1 A&B protection SCADA modification | 22.46 Days
Continuous |
|
01-Nov-23 08:01 | 23-Nov-23 18:00 | ATCO, SUNCOR | Outage | 29PL9-1 (29EDD-1 Millennium - 848s Ruth Lake), 29EDD-1 29EDD1s452 (29EDD-1 Millennium), 29EDD-1 29EDD1s552 (29EDD-1 Millennium), 29EDD-1 29EDD1SPL9-1 (29EDD-1 Millennium) | BP-29PL9-1 A & B protection retrofit and associated pre-commissioning / commissioning. 260kV ring bus will remain open for line protection retrofit scope of work. (Outage #1b) | 22.46 Days
Continuous |
|
06-Nov-23 09:00 | 01-Dec-23 17:05 | ATCO | TE | 700s Protection & Control (700s Bonnyville), 700s RTU/SCADA (700s Bonnyville) | relay firmware upgrades required prior to implementing SCADA upgrade | 25.34 Days
Continuous |
|
08-Nov-23 09:00 | 26-Nov-23 17:00 | ATCO | Outage | 790s 701T (790s Poplar Hill) | testing & bus and feeder relay replacement | 18.33 Days
Continuous |
|
10-Nov-23 17:00 | 09-Apr-24 17:00 | EPCOR | Outage | T2 (Rossdale) | TX2 LCR, civil demo and construction | 150.96 Days
Continuous |
|
13-Nov-23 07:00 | 24-Nov-23 17:00 | ALTALINK | TE | 15s RTU/SCADA (15s Fort Macleod) | add and test new points for the L6, L8, and L12 feeder protection upgrades and breaker replacements | 11.42 Days
Continuous |
|
13-Nov-23 07:00 | 20-Dec-23 17:00 | EPCOR | TE | 987s Protection & Control (987s Clover Bar) | protection blocking for expansion cut-overs | 37.42 Days
Continuous |
|
13-Nov-23 11:00 | 24-Nov-23 13:00 | ALTALINK | Outage | 612L (336s Fincastle - 368s Burdett), 368s 612 (368s Burdett), 336s 612 (336s Fincastle) | upgrade 368s612L A and B line protections and 368s612 breaker fail protection | 11.08 Days
Continuous |
|
13-Nov-23 11:00 | 24-Nov-23 12:00 | ALTALINK | TE | 368s Protection & Control (368s Burdett) | 368s612 breaker fail integration | 11.04 Days
Continuous |
|
13-Nov-23 23:08 | 21-Dec-23 18:00 | ALTALINK | Outage | 89s 1852 (89s Ellerslie) | emergency replacement of failed 89s1852 | 37.79 Days
Continuous |
|
14-Nov-23 08:00 | 24-Nov-23 15:00 | ALTALINK | TE | AltaLink Telecom Equipment | relocate AltaLink's 2012F fiber cable from its temporary location to its permanent location | 10.29 Days
Continuous |
|
14-Nov-23 09:00 | 24-Nov-23 16:30 | ATCO | TE | 2029s Heathfield, ATCO PMU | replace faulty PMU and commission | 10.31 Days
Continuous |
|
14-Nov-23 10:00 | 04-Dec-23 17:00 | ATCO | TE | 755s Protection & Control (755s Cordel), 755s RTU/SCADA (755s Cordel) | new panel installed to facilitate RAS 211 and 215, complete wiring and testing, configuration changes and updates | 20.29 Days
Continuous |
|
14-Nov-23 11:00 | 24-Nov-23 17:00 | ATCO | TE | 840s Protection & Control (840s McNeill Station), 840s RTU/SCADA (840s McNeill Station) | replacement and commissioning of operating work station | 10.25 Days
Continuous |
|
14-Nov-23 18:01 | 04-Dec-23 18:00 | ATCO, SUNCOR | Outage | 29PL9-1 (29EDD-1 Millennium - 848s Ruth Lake), 29PL9-2 (29EDD-1 Millennium - 848s Ruth Lake) | reconductoring for 29PL9-2 29PL9-2 B protection retrofit and associated pre-commissioning / commissioning (Nov 14 to Dec 02 18:00) reconductoring for 29PL9-1 29PL9-1 A & B protection retrofit and associated pre-commissioning / commissioning (Nov 21 22:01 to Dec 04, 18:00) |
20 Days
Continuous |
|
15-Nov-23 07:00 | 24-Nov-23 17:00 | ALTALINK | TE | 15s Protection & Control (15s Fort Macleod) | trip testing of new L6, L8, and L12 feeder protections on 138 kV bus | 9.42 Days
Continuous |
|
18-Nov-23 07:00 | 01-Dec-23 18:00 | ALTALINK | Outage | 922L (17s Benalto - 310p Sundance), 310p 1952 (310p Sundance), 310p 2052 (310p Sundance) | new line location of 922L - between structure 8-13 and will install new towers and conductor and complete the cut over from old alignment to new alignment | 13.46 Days
Continuous |
|
18-Nov-23 07:30 | 01-Dec-23 17:30 | ALTALINK | RB | 926L (17s Benalto - 310p Sundance) | close proximity due to common tower with 926L | 13.42 Days
Continuous |
|
18-Nov-23 08:00 | 02-Dec-23 17:00 | Lethbridge | Outage | 823L (146s MacDonald - 593s Lakeview), 593s T2 (593s Lakeview), 593s 823L (593s Lakeview), 146s 823L (146s Macdonald) | replacing 593s 823L HV breaker | 14.38 Days
Continuous |
|
18-Nov-23 15:08 | 24-Nov-23 17:00 | ATCO | Outage | 813s 503R (813s Little Smoky) | forced outage | 6.08 Days
Continuous |
|
20-Nov-23 07:00 | 23-Nov-23 18:00 | ALTALINK | TE | AML 511s RTU/SCADA (AML 511s Crossings) | fusion re-wiring | 3.46 Days
Daily |
|
20-Nov-23 07:00 | 24-Nov-23 17:00 | EPCOR | Outage | T2 (Rossdale), R723 (Rossdale), R721 (Rossdale), RAB2 (Rossdale) | Rossdale - TX2 zone for pile installs | 4.42 Days
Continuous |
|
20-Nov-23 07:00 | 24-Nov-23 17:00 | ENMAX, ALTALINK | TE | 653s RTU/SCADA (653s Summit) | update SCADA configuration | 4.42 Days
Daily |
|
20-Nov-23 07:00 | 07-Dec-23 17:00 | ENMAX, ALTALINK | TE | 653s Protection & Control (653s Summit) | remove RAS 49, and RAS 50 B relay from service | 17.42 Days
Continuous |
|
20-Nov-23 08:00 | 24-Nov-23 16:00 | ENMAX | Outage | 32.3TR (SS-32) | oil filtration unit replacement, gas monitor maintenance, oil sampling, relay protection test | 4.33 Days
Continuous |
|
20-Nov-23 08:30 | 23-Nov-23 17:30 | ALTALINK | IO | 7L50 (A757s - 252s - 526s) ATCO RB | ATCO 7L50 pole and arm replacement using live line techniques | 3.38 Days
Daily |
|
20-Nov-23 08:30 | 24-Nov-23 17:00 | ALTALINK | TE | 391s RTU/SCADA (391s Balzac) | download new configurations for DDR to RTU | 4.35 Days
Daily |
|
20-Nov-23 09:00 | 24-Nov-23 17:30 | ATCO | TE | 757s Protection & Control (757s Battle River), 757s RTU/SCADA (757s Battle River) | complete wiring, modify 9L80 protection settings and commission protections modifications, i includes RTU updates and alarm testing |
4.35 Days
Continuous |
|
20-Nov-23 09:00 | 24-Nov-23 16:00 | ALTALINK | TE | 74s Protection & Control (74s Janet) | add telecom channel and update relay firmware | 4.29 Days
Continuous |
|
20-Nov-23 10:00 | 24-Nov-23 17:00 | ATCO | Outage | 9L80 (755s Cordel - 757s Battle River), 757s 912T (757s Battle River), 757s 912 (757s Battle River), 757s 710 (757s Battle River), 755s 903 (755s Cordel), 755s 904 (755s Cordel), 757s 9L80D1 (757s Battle River), 755s 9L80D2 (755s Cordel) | termination and commissioning of 9L80 LTO and 912T TO | 4.29 Days
Continuous |
|
20-Nov-23 10:00 | 24-Nov-23 16:00 | ATCO | Outage | 7L172 (739s Edith Lake - 743s Sarah Lake), 739s 702 (739s Edith Lake), 743s 704 (743s Sarah Lake) | bringing over 7L172 relays to the new SCADA pane and testing | 4.25 Days
Continuous |
|
20-Nov-23 11:00 | 24-Nov-23 17:30 | ATCO, ALTALINK | Outage | 840s McNeill Station, 830L (562s Cypress - 840s McNeill Station) | replacement and commissioning of operating work station, and verification of alarming from devices to station HMI | 4.27 Days
Continuous |
AB-SK |
20-Nov-23 11:00 | 24-Nov-23 17:00 | ALTALINK | TE | 38s RTU/SCADA (38s East Edmonton) | update configuration for replacing A21/L20 761L protection at 38s | 4.25 Days
Daily |
|
20-Nov-23 11:00 | 24-Nov-23 17:00 | ALTALINK | TE | 71s RTU/SCADA (71s Lamoureux) | update configuration for replacing A21/L4 761L protection at 71s | 4.25 Days
Daily |
|
20-Nov-23 11:00 | 24-Nov-23 17:00 | ALTALINK | TE | 38s Protection & Control (38s East Edmonton) | configuration and updating MAC filtering for relay 87/B2 | 4.25 Days
Daily |
|
20-Nov-23 12:30 | 23-Nov-23 16:30 | ALTALINK | RB | 501CL (983s Cadomin - 501L tap), 501L (426s Coalspur - 501CL tap) | component replacement on 501L (str's Range 1 -281) | 3.17 Days
Continuous |
|
20-Nov-23 14:15 | 30-Nov-23 14:45 | ALTALINK | Outage | 989L (77s Sagitawah - 310p Sundance), 77s 26 (77s Sagitawah), 77s 29 (77s Sagitawah), 77s 989X (77s Sagitawah), 310p 2652 (310p Sundance), 310p 2752 (310p Sundance) | breaker replacement (77s26) and new foundations and new cabling | 10.02 Days
Continuous |
|
20-Nov-23 14:15 | 24-Nov-23 14:45 | ALTALINK | Outage | 77s 51 (77s Sagitawah) | safety requirement for 77s26 GOI | 4.02 Days
Continuous |
|
21-Nov-23 07:00 | 29-Nov-23 18:00 | ALTALINK | Outage | 776L (308s Albchem Beaverhill Creek - 410s Josephburg) | line clearance mitigation measures | 8.46 Days
Continuous |
|
21-Nov-23 07:00 | 25-Nov-23 18:00 | ALTALINK | Outage | 953L (574s Nilrem - 755s Cordel) | replace dampers on 953L structures 284-347 | 4.46 Days
Continuous |
|
21-Nov-23 07:00 | 25-Nov-23 18:00 | ALTALINK | RB | 1047L (574s Nilrem - 650s Hansman Lake) | replace dampers on 953L structures 284-347 | 4.46 Days
Continuous |
|
21-Nov-23 07:00 | 25-Nov-23 18:00 | ALTALINK | RB | 948L (650s Hansman Lake - 863s Paintearth) | replace dampers on 953L structures 284-347 | 4.46 Days
Continuous |
|
21-Nov-23 07:00 | 25-Nov-23 18:00 | ATCO | Outage | 9L953 (574s Nilrem - 755s Cordel) | replace dampers on 953L structures 284-347 | 4.46 Days
Continuous |
|
21-Nov-23 07:00 | 25-Nov-23 18:00 | ATCO | IO | 9L948 (650s Hansman Lake - 863s Paintearth) | AltaLink request for reclosing blocked on 9L948, replace dampers on 953L structures 284-347 | 4.46 Days
Continuous |
|
21-Nov-23 08:00 | 23-Nov-23 16:00 | ALTALINK | TE | 102s Protection & Control (102s Langdon) | 102s SVC relay maintenance | 2.33 Days
Daily |
|
21-Nov-23 08:00 | 26-Nov-23 17:00 | ALTALINK, ATCO | Outage | 356s 240kV Bus1 (356s Milo), 1036L (356s Milo - 554s Travers), 356s 852 (356s Milo), 356s 752 (356s Milo), 356s 452 (356s Milo), 356s 152 (356s Milo), 356s 1036 (356s Milo) | line install over bus 1 to new dead end bridge | 5.38 Days
Continuous |
|
21-Nov-23 08:00 | 26-Nov-23 17:00 | ALTALINK | Outage | 719L (378s Shell Caroline - 575s Sundre), 719L (378s Shell Caroline - 719BL tap), 378s 452 (378s Shell Caroline), 378s 552 (378s Shell Caroline), 378s 652 (378s Shell Caroline), 575s 719N (575s Sundre), 378s 719N (378s Shell Caroline), 378s 719X (378s Shell Caroline) | maintenance work on structures | 5.38 Days
Continuous |
|
21-Nov-23 08:00 | 26-Nov-23 00:00 | ALTALINK | RB | 1005L (120s Picture Butte - 1005AL tap), 1005L (356s Milo - 1005AL tap), 1005AL (991s Little Bow - 1005L tap) | installing new 1036L structure 1, proximity requirement | 4.67 Days
Daily |
|
21-Nov-23 08:00 | 30-Nov-23 17:00 | ALTALINK | TE | 77s RTU/SCADA (77s Sagitawah) | RTU database update | 9.38 Days
Daily |
|
21-Nov-23 09:00 | 23-Nov-23 17:00 | BCH | Outage | T4 (BCH Natal) | NTL ATS replacement | 2.33 Days
Continuous |
AB-BC |
21-Nov-23 10:00 | 24-Nov-23 16:00 | ATCO | TE | 790s RTU/SCADA (790s Poplar Hill) | RTU configuration updates | 3.25 Days
Continuous |
|
22-Nov-23 07:00 | 20-Dec-23 17:00 | ALTALINK, EPCOR | Outage | 921L (71s Lamoureux - 987s Clover Bar), 987s T2 (987s Clover Bar), 987s T4 (987s Clover Bar), 987s CC721 (987s Clover Bar), 987s CDS31 (987s Clover Bar), 987s C2404 (987s Clover Bar), 987s C2405 (987s Clover Bar), 987s C2406 (987s Clover Bar), 987s C2408 (987s Clover Bar), 987s CDS39 (987s Cloverbar) | Cloverbar S/S 240 kV re-configuration as part of the air products project | 28.42 Days
Continuous |
|
22-Nov-23 07:00 | 20-Dec-23 17:00 | ALTALINK, EPCOR | IO | 921L (71s Lamoureux - 987s Clover Bar) | Cloverbar S/S 240 kV re-configuration as part of the air products project | 28.42 Days
Continuous |
|
22-Nov-23 10:00 | 23-Nov-23 17:00 | ATCO | TE | ATCO Telecom Equipment | update 1045S 7L50 RAS #134 RAS A and B relays and commission | 31 Hours
Continuous |
|
22-Nov-23 23:00 | 23-Nov-23 03:00 | ALTALINK | Outage | 250p 22 (250p Bighorn Plant) | maintenance | 4 Hours
Daily |
|
23-Nov-23 07:00 | 23-Nov-23 16:00 | ATCO, ALTALINK, FMGW | TE | 1024s RTU/SCADA (1024s Granlea) | new software push to the Siemens system | 9 Hours
Continuous |
|
23-Nov-23 07:30 | 24-Nov-23 18:00 | ALTALINK | RB | 846L (127s Bruderheim - 365s Canadianoxy Astotin Creek) | replacing Guy wire and adding anchor extensions at STR 3 | 1.44 Days
Daily |
|
23-Nov-23 08:00 | 23-Nov-23 17:00 | ATCO | TE | 2029s Protection & Control (2029s Heathfield) | RAS HUB-A SEL-3530 settings update | 9 Hours
Continuous |
|
23-Nov-23 08:00 | 23-Nov-23 10:00 | ENMAX | Outage | 35B138-83 (SS-35) | breaker trip coil test | 2 Hours
Continuous |
|
23-Nov-23 08:00 | 24-Nov-23 17:00 | ALTALINK | TE | AltaLink Telecom Equipment | upgrade 9900R Ellscott Radio MPLS nodes | 1.38 Days
Daily |
|
23-Nov-23 08:00 | 23-Nov-23 16:00 | ENMAX | Outage | 5.10TR (SS-5) | 5.10 TC replace PRD junction box, 5.10TR LTC counter, check reversing switch 5.10TR | 8 Hours
Continuous |
|
23-Nov-23 08:00 | 23-Nov-23 16:00 | ENMAX | Outage | 162.4TR (SS-162) | 162.4TR SEL-387E settings changes | 8 Hours
Continuous |
|
23-Nov-23 08:30 | 23-Nov-23 17:00 | ALTALINK | TE | 391s Protection & Control (391s Balzac) | install new output card, setting changes and module internal wiring modifications to add line protection operation initiates to new DDR being installed | 8.5 Hours
Daily |
|
23-Nov-23 08:30 | 23-Nov-23 17:00 | ATCO | TE | ATCO Telecom Equipment | maintenance on aprisa radio at kitscoty | 8.5 Hours
Continuous |
|
23-Nov-23 09:00 | 23-Nov-23 17:00 | ALTALINK | Outage | 151s T1 (151s Strathmore) | close open point A | 8 Hours
Continuous |
|
23-Nov-23 09:00 | 23-Nov-23 15:00 | ENMAX, ALTALINK | Outage | 653.2TR (653s Summit), 653s 138-653.2TR (653s Summit) | connect CTs to new B bus protection and perform trip tests | 6 Hours
Continuous |
|
23-Nov-23 09:00 | 23-Nov-23 18:00 | ATCO | TE | 739s RTU/SCADA (739s Edith Lake), ATCO Telecom Equipment | low bes checkpoint firewall installs | 9 Hours
Continuous |
|
23-Nov-23 09:00 | 24-Nov-23 17:00 | ATCO, CNRL | TE | 847s RTU/SCADA (847s Muskeg River) | low bes firewall install | 1.33 Days
Continuous |
|
23-Nov-23 10:01 | 23-Nov-23 12:00 | ENMAX | Outage | 35B138-82 (SS-35) | breaker trip coil test | 119 Mins
Continuous |
|
23-Nov-23 12:01 | 23-Nov-23 14:00 | ENMAX | Outage | 35B138-80 (SS-35) | breaker trip coil test | 119 Mins
Continuous |
|
23-Nov-23 13:00 | 23-Nov-23 14:00 | ALTALINK | TE | 177s RTU/SCADA (177s West Cascade), 29s RTU/SCADA (29s Cascade) | urgent configuration update for cutover to new pad mount switchgear | 60 Mins
Daily |
|
23-Nov-23 14:01 | 23-Nov-23 16:00 | ENMAX | Outage | 35B138-81 (SS-35) | breaker trip coil test | 119 Mins
Continuous |
|
24-Nov-23 07:00 | 22-Dec-23 17:00 | EPCOR | Outage | 330P 12TC1 (330p Genesee), 330p 805 (330p Genesee) | Genesee S/S 12TC1 decommissioning | 28.42 Days
Continuous |
|
24-Nov-23 08:00 | 24-Nov-23 17:00 | ALTALINK | TE | AltaLink Telecom Equipment, 198s RTU/SCADA (198s Blackfalds), 482s RTU/SCADA (482s Haynes) | 9195R MPLS node A work | 9 Hours
Daily |
|
24-Nov-23 08:00 | 24-Nov-23 18:00 | BCH, ALTALINK | Outage | 1L275 (799s Coleman - BCH Natal), 1CB2 (BCH Natal), 799s 786W (799s Coleman) | emergent hot spot repairs | 10 Hours
Continuous |
AB-BC |
24-Nov-23 08:00 | 24-Nov-23 18:00 | ALTALINK | Outage | 786L (799s Coleman - BCH Natal) | emergency - hot spot repairs | 10 Hours
Daily |
|
24-Nov-23 08:30 | 24-Nov-23 17:00 | ALTALINK | TE | 391s Protection & Control (391s Balzac) | cut in CT circuit to DDR, setting changes and wiring modifications to add line protection operation initiates to new DDR being installed | 8.5 Hours
Daily |
|
24-Nov-23 13:00 | 24-Nov-23 14:00 | ALTALINK | TE | 177s RTU/SCADA (177s West Cascade), 29s RTU/SCADA (29s Cascade) | urgent configuration update for cutover to new pad mount switchgear | 60 Mins
Daily |
|
25-Nov-23 07:00 | 26-Nov-23 17:00 | ALTALINK | TE | 14s RTU/SCADA (14s Devon) | update configuration for new AC fail, battery charger fail, DC ground and battery electrolyte alarms | 1.42 Days
Daily |
|
25-Nov-23 07:30 | 30-Nov-23 17:30 | ALTALINK | RB | 174L (197s Bardo - 289s Saunders Lake) | safety requirement re 858L GOI | 5.42 Days
Daily |
|
25-Nov-23 08:00 | 25-Nov-23 16:00 | ENMAX | Outage | 31.2TR (SS-31) | oil Sampling | 8 Hours
Continuous |
|
26-Nov-23 00:00 | 26-Nov-23 06:00 | ATCO | TE | 845s Protection & Control (845s Big Mountain), 813s Protection & Control (813s Little Smoky) | hybrid wireless (service provider) will be doing fiber repairs | 6 Hours
Continuous |
|
26-Nov-23 07:00 | 30-Nov-23 18:00 | ALTALINK | RB | 948L (650s Hansman Lake - 863s Paintearth) | replace dampers on 1047L structures 1-64 | 4.46 Days
Continuous |
|
26-Nov-23 07:00 | 30-Nov-23 18:00 | ALTALINK | RB | 953L (574s Nilrem - 755s Cordel) | replace dampers on 1047L structures 1-64 | 4.46 Days
Continuous |
|
26-Nov-23 07:00 | 30-Nov-23 18:00 | ALTALINK | Outage | 1047L (574s Nilrem - 650s Hansman Lake) | replace dampers on 1047L structures 1-64 | 4.46 Days
Continuous |
|
26-Nov-23 07:00 | 30-Nov-23 18:00 | ATCO | IO | 9L953 | AltaLink request - replace dampers on 1047L structures 1-64 | 4.46 Days
Continuous |
|
26-Nov-23 07:00 | 30-Nov-23 18:00 | ATCO | IO | 9L948 (650s Hansman Lake - 863s Paintearth) | AltaLink request, replace dampers on 1047L structures 1-64
|
4.46 Days
Continuous |
|
26-Nov-23 10:00 | 26-Nov-23 16:00 | ATCO | RB | 790s 144kV Bus 700BS1 (790s Poplar Hill), 790s 144kV Bus 700BS2 (790s Poplar Hill) | attach 902S 144 kV risers | 6 Hours
Continuous |
|
27-Nov-23 07:00 | 04-Dec-23 17:00 | ALTALINK | TE | 63s Protection & Control (63s Red Deer) | return temporary settings changes on 63s912L A21/L4 line protections back to original settings | 7.42 Days
Continuous |
|
27-Nov-23 07:00 | 01-Dec-23 17:00 | ATCO, PWLP | TE | 973s Protection & Control (973s Lanes Lake) | end to end testing on APS 211 and APS 215 with 755S Cordel (CSP#2-00076170) | 4.42 Days
Continuous |
|
27-Nov-23 07:00 | 02-Dec-23 17:00 | EPCOR | Outage | T2 (Meadowlark), M722 (Meadowlark), M723 (Meadowlark) | TX2 zone CVT Replacement | 5.42 Days
Continuous |
|
27-Nov-23 08:00 | 11-Dec-23 13:00 | ATCO, ALTALINK | IO | 1085L (852s Round Hill - 885s McMillan) | 885S McMillan sub protection upgrade - ATCO advice | 14.21 Days
Continuous |
|
27-Nov-23 08:00 | 07-Dec-23 17:00 | ATCO | TE | 766s Protection & Control (766s Nevis), 755s Protection & Control (755s Cordel) | 9L20 and 9L912 bypass removal relay work | 10.38 Days
Continuous |
|
27-Nov-23 08:00 | 01-Dec-23 17:00 | ALTALINK | TE | 28s RTU/SCADA (28s West Brooks) | implement fault reporting on 1052L (L2), 1075L (L3), 1051L (L4), 853L (L6), 666L (L10) lines | 4.38 Days
Daily |
|
27-Nov-23 08:00 | 08-Dec-23 16:00 | ALTALINK | TE | 368s Protection & Control (368s Burdett) | 96/79/25SC/352 (368s612) & 96/79/452 (368s722X) protection outage is required to integrate the new breaker fail trips from 368s612 | 11.33 Days
Continuous |
|
27-Nov-23 08:00 | 30-Nov-23 15:00 | ALTALINK | TE | 602s RTU/SCADA (602s Cold Creek) | update configuration for transformer protection alarm splitting | 3.29 Days
Daily |
|
27-Nov-23 08:00 | 01-Dec-23 17:00 | ALTALINK | TE | 28s 931N (28s West Brooks) | protection outages to implement fault reporting;1052L A87/21/L2,1052L B87/21/L2,1075L A21/L3,1051L A87/21/79/L4, 1051L B87/21/L4, 853L A21/L6, 853L B21/79/L6, 666L A21/79/L10,666L B21/L10 | 4.38 Days
Daily |
|
27-Nov-23 08:00 | 28-Nov-23 17:00 | ALTALINK | TE | 391s RTU/SCADA (391s Balzac) | download new configurations for any deficiency cleanup if required as part of the new DDR installation | 1.38 Days
Daily |
|
27-Nov-23 08:00 | 30-Nov-23 17:00 | ALTALINK | TE | AltaLink Telecom Equipment, 228s RTU/SCADA (228s T.M.P.L. Niton) | 4G RTU upgrade project at 228s | 3.38 Days
Daily |
|
27-Nov-23 08:00 | 30-Nov-23 17:00 | ALTALINK | Outage | 719L (378s Shell Caroline - 719BL tap) | Maintenance work on structures 191J, 191L, 192,-195, 198, 200, 202 & 207 | 3.38 Days
Continuous |
|
27-Nov-23 08:00 | 07-Dec-23 18:00 | Syncrude | Outage | 13 (Aurora) | breaker 52-13 replacement | 10.42 Days
Continuous |
|
27-Nov-23 08:00 | 30-Nov-23 18:00 | ATCO, ALTALINK | RB | 1036L (356s Milo - 554s Travers) | setting poles and install anchors for new 1097L structure 1 near 1035L. required for proximity | 3.42 Days
Daily |
|
27-Nov-23 08:00 | 07-Mar-25 16:00 | ENMAX | Outage | 32.2TR (SS-32) | 32 sub 32.2TR 8 kV bus switchgear demolition | 466.33 Days
Continuous |
|
27-Nov-23 08:00 | 27-Nov-23 17:00 | ALTALINK | TE | 447s RTU/SCADA (447s Enchant) | cutting over SCADA supervisory circuit to new MPLS at 447s Enchant | 9 Hours
Daily |
|
27-Nov-23 09:00 | 30-Nov-23 16:30 | ATCO | Outage | 7L50 (757s Battle River - 491L tap) | 7L50 Pole and arm replacement | 3.31 Days
Continuous |
|
27-Nov-23 09:00 | 03-Dec-23 16:00 | ATCO | Outage | 7L32 (813s Little Smoky - 862s South Bezanson) | line to ground mitigation | 6.29 Days
Continuous |
|
27-Nov-23 09:00 | 27-Nov-23 12:00 | ATCO | Outage | 845s 701 (845s Big Mountain) | PRC-005 Trip Coil Testing | 3 Hours
Continuous |
|
27-Nov-23 09:30 | 01-Dec-23 17:30 | ALTALINK | RB | 757L (17s Benalto - 758L tap), 757L (297s Rimbey - 758L tap) | repairing U/B violation on structure #757L215 | 4.33 Days
Daily |
|
27-Nov-23 09:30 | 10-Dec-23 19:00 | ENMAX, ALTALINK | Outage | 918L (281s Johnson - SS-162) | completion of replacement of bent steel, re-tie/replace OHSW dampers, installation on aerial number boards, and damper replacement between structures 606-840 | 13.4 Days
Continuous |
|
27-Nov-23 09:30 | 10-Dec-23 19:00 | ENMAX, ALTALINK | IO | 918L (281s Johnson - SS-162) | Altalink outage - completion of replacement of bent steel, re-tie/replace OHSW dampers, installation on aerial number boards, and damper, switching C162s 162MD240-918L and 918L recloser block | 13.4 Days
Continuous |
|
27-Nov-23 09:30 | 27-Nov-23 18:00 | ALTALINK | Outage | 391s 611 (391s Balzac), 611L (186s Dry Creek - 391S Balzac) | 391s611 (152) breaker outage to cut over and commission CT circuits, 152 breaker status, 152 Breaker Failure and line protection operation initiates to new DDR being installed. | 8.5 Hours
Daily |
|
27-Nov-23 10:00 | 27-Nov-23 17:00 | ATCO | Outage | 755s 903 (755s Cordel) | open bkr 903 | 7 Hours
Continuous |
|
27-Nov-23 10:00 | 04-Dec-23 12:00 | ATCO | Outage | 7L40 (733s Simonette - 813s Little Smoky) | pole replacement | 7.08 Days
Continuous |
|
27-Nov-23 10:00 | 27-Nov-23 17:30 | ALTALINK | Outage | 611L (186s Dry Creek - 391S Balzac) | Lengthen risers on the line at 391s | 7.5 Hours
Daily |
|
27-Nov-23 10:00 | 30-Nov-23 17:00 | ALTALINK | TE | 63s Protection & Control (63s Red Deer) | perform maintenance on the following non redundant breaker protections S1852 96/1852, S2652 25SC/2652, S2752 25SC/2752, S552 25SC/552, S652 25SC/652 | 3.29 Days
Daily |
|
27-Nov-23 10:00 | 28-Nov-23 17:00 | ATCO | TE | 801s RTU/SCADA (801s Anderson) | annual maintenance at 801s including: - SMP (station Controller) - RTAC SEL-3530 - GE RTU |
31 Hours
Continuous |
|
27-Nov-23 11:00 | 27-Nov-23 12:00 | ATCO | TE | Sulphur Point_S-Telecom, 930s RTU/SCADA (930s Arcenciel) | upgrade Sulphur Point NET 1 SAR OS | 60 Mins
Continuous |
|
27-Nov-23 11:00 | 27-Nov-23 16:00 | ALTALINK | Outage | 368s T1 (368s Burdett) | integrate A87/138B trip and 368s612/368s722X CT contributions to 368sT1 (Tx18739) | 5 Hours
Daily |
|
27-Nov-23 11:00 | 27-Nov-23 15:00 | ALTALINK | TE | AltaLink Telecom Equipment | 251s - complete MPLS upgrade and LAN switch install | 4 Hours
Daily |
|
27-Nov-23 12:00 | 30-Nov-23 16:00 | ATCO | Outage | 9L56 (720s Wabasca - 876s Brintnell), 876s 902 (876s Brintnell), 876s 904 (876s Brintnell) | 21A&B/ 9L56, 50BF/902 RTXP Test Switch Replacement, PRC-005 Relay Testing 21A&B / 9L56 an 50BF/ Bkr 902, PRC-005 Trip Coil Testing Breaker 902 | 3.17 Days
Continuous |
|
27-Nov-23 12:00 | 30-Nov-23 16:00 | ATCO | TE | 879s Protection & Control (879s Scotford Upgrader) | 21A&B/ 9L56, 50BF/902 RTXP Test Switch Replacement, PRC-005 Relay Testing 21A&B / 9L56 an 50BF/ Bkr 902, PRC-005 Trip Coil Testing Breaker 902 | 3.17 Days
Continuous |
|
27-Nov-23 12:00 | 28-Nov-23 17:00 | ALTALINK | TE | 723s Protection & Control (723s Christina Lake) | upgrade all cards in B87/50/51/51NN/T1 relay | 29 Hours
Daily |
|
27-Nov-23 12:00 | 28-Nov-23 17:00 | ALTALINK | TE | 723s RTU/SCADA (723s Christina Lake) | update configuration as part of B87/50/51/51NN/T1 relay card replacements | 29 Hours
Daily |
|
27-Nov-23 12:00 | 11-Dec-23 13:00 | ATCO, ALTALINK | Outage | 885s 902T (885s McMillan), 9L55 (AML 852s Round Hill - 885s McMillan), 885s 260kV Bus 900BS2 (885s McMillan), 885s 902 (885s McMillan), 885s 903 (885s McMillan), 885S 902TD (885s McMillan), 885S 702TD (885s McMillan), 885s 704 (885s McMillan), 885s 501R (885s McMillan) | 885s McMillan sub protection upgrade: complete protection cut over and commissioning of new protection on 902T, 704/7L02 Line protection, 25kV reactor protection | 14.04 Days
Continuous |
|
27-Nov-23 12:01 | 27-Nov-23 15:00 | ATCO | Outage | 845s 702 (845s Big Mountain) | PRC-005 Trip Coil Testing | 2.98 Hours
Continuous |
|
27-Nov-23 12:30 | 30-Nov-23 16:30 | ALTALINK | RB | 501CL (983s Cadomin - 501L tap), 501L (426s Coalspur - 501CL tap) | component replacement 501L (str's range 1 -281) | 3.17 Days
Continuous |
|
27-Nov-23 12:30 | 30-Nov-23 17:30 | ALTALINK | RB | 701L (223s Strome - 395s North Holden) | woodpecker damage inspection (str 1-320C) | 3.21 Days
Daily |
|
27-Nov-23 12:30 | 30-Nov-23 17:30 | ALTALINK | RB | 701L (223s Strome - 7LA701 tap) | woodpecker damage inspection (str 320D-449) | 3.21 Days
Daily |
|
27-Nov-23 12:30 | 30-Nov-23 17:30 | ALTALINK | RB | 702L (137s Sedgewick - 377s AML Hardisty), 702L (137s Sedgewick - 757s Battle River) | woodpecker damage inspections (str 11-456) | 3.21 Days
Daily |
|
27-Nov-23 12:30 | 30-Nov-23 17:30 | ATCO | IO | 7L702 (137s Sedgewick - 757s Battle River) | Altalink - woodpecker damage inspections (str 11-456) | 3.21 Days
Continuous |
|
27-Nov-23 12:30 | 30-Nov-23 17:30 | ATCO | IO | 7L701 (757s Battle River - 7LA701 tap) | AltaLink work - woodpecker damage inspections (str 320D - 449) | 3.21 Days
Continuous |
|
27-Nov-23 13:00 | 27-Nov-23 17:00 | ALTALINK | Outage | 658L (562s Cypress - 658AL tap), 658L (649s Chappice Lake - 658AL tap), 658AL (662s Hilda - 658AL tap) | Open North jumpers at structure 286A. | 4 Hours
Continuous |
|
27-Nov-23 13:00 | 01-Dec-23 16:30 | ALTALINK | TE | 394s Protection & Control (394s Empress) | disable 394s 1134 AIS A77 and B77 anti-islanding relays for duration of 658L outage | 4.15 Days
Continuous |
|
27-Nov-23 15:00 | 01-Dec-23 16:00 | ALTALINK | RB | 658L (562s Cypress - 658AL tap), 658L (649s Chappice Lake - 658AL tap), 674L (244s Bowmanton - 649s Chappice Lake) | crews working in proximity to line str 287-365 | 4.04 Days
Daily |
|
27-Nov-23 17:00 | 01-Dec-23 12:30 | ALTALINK | Outage | 658L (649s Chappice Lake - 658AL tap) | 658L comp replacement (103-284) | 3.81 Days
Continuous |
|
28-Nov-23 07:00 | 29-Nov-23 18:00 | ALTALINK | Outage | 704L (51s Wainwright - 478s Tucuman) | Replace rotten structure 275. | 1.46 Days
Continuous |
|
28-Nov-23 07:30 | 01-Dec-23 17:30 | ALTALINK | RB | 995L (17s Benalto - 995AL tap), 995L (62s Brazeau Plant Plant - 995AL tap) | Replace bent steel tower members near base of structures 225 & 230. | 3.42 Days
Daily |
|
28-Nov-23 07:30 | 28-Nov-23 18:00 | ENMAX, ALTALINK | Outage | 162.81L (391s Balzac - SS-162), 391s 162.81 (391s Balzac) | 162.81L outage to cut over and commission CT circuits, 552 breaker status, 552 Breaker Failure and line protection operation initiates to new DDR being installed. | 10.5 Hours
Daily |
|
28-Nov-23 07:30 | 28-Nov-23 18:00 | ENMAX | IO | 162.81L (391s Balzac - SS-162) | Altalink outage | 10.5 Hours
Continuous |
|
28-Nov-23 08:00 | 28-Nov-23 16:00 | ALTALINK | Outage | 368s C1 (368s Burdett), 368s C2 (368s Burdett) | integrate new A87/138B, 368s612 & 368s722X breaker fail trip to 368s C1 & C2 | 8 Hours
Daily |
|
28-Nov-23 08:00 | 05-Dec-23 18:00 | SUNCOR | Outage | 29PL7-1 (29EDD-34 - 29EDD-85), 29EDD-34 29-752-121 (29EDD-34), 29EDD-85 29PS-426 (29EDD-85) | connect 29PL7-1 CT circuit to newly installed DFR relay | 7.42 Days
Continuous |
|
28-Nov-23 08:00 | 29-Nov-23 17:00 | ALTALINK | TE | 275s Protection & Control (275s Jenner) | Techs to perform settings changes to disable FTP on the following redundant line protection: 1002L A21/79/L3 SEL421, 951L A21/79/L2 SEL 421, 601L B21/67/96/L13 - Redundant Protections Available. and 11(96/25SC/79)/1652 URC60 - Non redundant Protection* | 1.38 Days
Daily |
|
28-Nov-23 08:00 | 01-Dec-23 16:00 | ATCO | TE | ATCO Telecom Equipment | Full Outage to Link, Carrier replacement - Louise creek to Virginia hills - Redundant protection in service TPRNN118 / 6L126 A TPRNT005 / 9L938 A TPRNT007 / 9L939 A TPRNT009 / 9L913 A |
3.33 Days
Continuous |
|
28-Nov-23 08:00 | 28-Nov-23 18:00 | Syncrude | TE | Syncrude RTU/SCADA (Syncrude Mildred Lake) | AESO Project # P7071 Go WAN Project Phase 3 – UTN network end to end connectivity: Phase 4 – Network and app |
10 Hours
Continuous |
|
28-Nov-23 08:00 | 28-Nov-23 16:00 | ENMAX | IO | Protection & Control (SS-9) | SSTR9-2, SSTR9-1 Transformer Outage. Automatic Transfer Switch Maintenance - 9-ATS-9. Automatic transfer between transformers required prior to outage. Back-up generator install while station service TRs are offline. | 8 Hours
Continuous |
|
28-Nov-23 08:30 | 30-Nov-23 17:00 | ATCO | Outage | 2075s 902T (2075s Newell), 2075s ACF21 (2075s Newell) | During normal operation, SVC2 utilizes two glycol pumps, one of which recently failed. The single pump still in service is running 24/7 which is straining the device, and if it fails, SVC2 will trip off. As of today, the 2nd pump is showing signs of possible failure. |
2.35 Days
Continuous |
|
28-Nov-23 09:00 | 28-Nov-23 10:00 | ATCO | TE | ATCO Telecom Equipment | upgrade Sheerness net 11 SAR OS | 60 Mins
Continuous |
|
29-Nov-23 07:00 | 04-Dec-23 18:00 | ALTALINK | Outage | 688L (199s East Airdrie - 688AL tap) | Building new T-tap 688BL between Structures #688L61 & 62 to the new I-1055s Sollair Sub. | 5.46 Days
Continuous |
|
29-Nov-23 07:30 | 30-Nov-23 18:00 | ALTALINK | Outage | 391s T2 (391s Balzac) | 391s outage to cut over and commission | 1.44 Days
Continuous |
|
29-Nov-23 08:00 | 29-Nov-23 16:00 | ALTALINK | Outage | 368s 879 (368s Burdett), 879L (368s Burdett - 879L tap) | integrate the A87/138B CT | 8 Hours
Daily |
|
29-Nov-23 08:00 | 29-Nov-23 17:00 | Lethbridge | Outage | 593s 12 (593s Lakeview) | installing risers on 593s823l | 9 Hours
Continuous |
|
29-Nov-23 08:00 | 29-Nov-23 17:00 | ALTALINK | TE | AltaLink Telecom Equipment, 332s RTU/SCADA (332s Ellis), 212s RTU/SCADA (212s Lacombe), 332s Protection & Control (332s Ellis), 212s Protection & Control (212s Lacombe) | upgrade 332s MPLS node. | 9 Hours
Daily |
|
29-Nov-23 08:00 | 29-Nov-23 17:00 | ALTALINK | TE | AltaLink Telecom Equipment, 56s RTU/SCADA (56s Boyle), 56s Protection & Control (56s Boyle) | upgrade 9056R boyle radio MPLS node | 9 Hours
Daily |
|
29-Nov-23 09:00 | 29-Nov-23 17:00 | BCH | Outage | T4 (BCH Natal) | NTL SS4 PCB soil remediation | 8 Hours
Continuous |
AB-BC |
29-Nov-23 09:00 | 29-Nov-23 17:00 | ATCO | TE | ATCO Telecom Equipment | Low Bes Firewall Install, Total outage to IP Network access traffic for 90 minutes. Includes Sheerness Generation SCADA Visibility |
8 Hours
Continuous |
|
29-Nov-23 09:00 | 29-Nov-23 16:00 | ATCO | RB | 7L54 (794s Valleyview - 813s Little Smoky) | Set an additional pole on 7L32 by little smoky sub | 7 Hours
Continuous |
|
29-Nov-23 09:00 | 29-Nov-23 16:00 | ALTALINK | TE | 659s RTU/SCADA (659s Pegasus Lake) | supervisory outage required to test the recloser status | 7 Hours
Daily |
|
29-Nov-23 10:00 | 29-Nov-23 17:00 | ATCO | TE | 948s RTU/SCADA (948s Heatburg) | changing alarm relay names | 7 Hours
Continuous |
|
29-Nov-23 23:00 | 30-Nov-23 03:00 | ALTALINK | Outage | 62s 11 (62s Brazeau Plant) | maintenance | 4 Hours
Daily |
|
30-Nov-23 08:00 | 30-Nov-23 16:00 | ENMAX | IO | Protection & Control (SS-36) | SSTR36-2, SSTR36-1 Transformer Outage. Automatic Transfer Switch Maintenance - 36-ATS-36-1. Automatic transfer between transformers required prior to outage. Back-up generator install while station service TRs are offline. | 8 Hours
Continuous |
|
30-Nov-23 10:00 | 30-Nov-23 16:30 | ATCO | TE | 755s RTU/SCADA (755s Cordel) | firmware upgrade | 6.5 Hours
Continuous |
|
01-Dec-23 06:30 | 10-Dec-23 17:30 | ENMAX, ALTALINK | RB | 771L (SS-47 - SS-162) | required for 162.81L 461L 1-121 component replacement | 9.46 Days
Continuous |
|
01-Dec-23 06:30 | 10-Dec-23 17:30 | ENMAX, ALTALINK | RB | 771L (SS-47 - SS-162) | required for 918L replacements due to proximity | 9.46 Days
Daily |
|
01-Dec-23 07:00 | 07-Dec-23 17:00 | ALTALINK | TE | 199s Protection & Control (199s East Airdrie) | upgrade protections and implement new POTT scheme | 6.42 Days
Daily |
|
01-Dec-23 07:00 | 07-Dec-23 17:00 | ENMAX, ALTALINK | TE | 653s Protection & Control (653s Summit) | update 688L protection | 6.42 Days
Continuous |
|
01-Dec-23 07:00 | 07-Dec-23 17:00 | ALTALINK | TE | 199s RTU/SCADA (199s East Airdrie) | update SCADA configuration | 6.42 Days
Daily |
|
01-Dec-23 07:00 | 07-Dec-23 17:00 | ENMAX, ALTALINK | TE | 653s RTU/SCADA (653s Summit) | update SCADA configuration | 6.42 Days
Daily |
|
01-Dec-23 07:00 | 01-Dec-23 10:00 | ALTALINK | Outage | 126L1 (6L126 tap) | Test operation of 126L1 (affecting 6L126) to see if adjustments or switch replacements is required | 3 Hours
Continuous |
|
01-Dec-23 07:30 | 01-Dec-23 09:30 | ATCO | IO | 6L126 (743s Sarah Lake - 515L tap) | AltaLink Request for Isolation on 6L126 at 743S Sarah Lake to Test operation of 126L1 | 2 Hours
Continuous |
|
01-Dec-23 08:00 | 01-Dec-23 13:00 | ALTALINK | Outage | 368s T2 (368s Burdett) | integrate A87/138B trip & 368s612/368s722X CT contributions to 368sT2 (Tx18500) | 5 Hours
Daily |
|
01-Dec-23 08:30 | 01-Dec-23 17:00 | ALTALINK | TE | 391s Protection & Control (391s Balzac) | setting changes and wiring additions to add protection operation initiates to new DDR being installed | 8.5 Hours
Daily |
|
01-Dec-23 09:00 | 01-Dec-23 17:30 | ATCO | TE | 749s Flyingshot Lake Protection & Control, 749s Flyingshot Lake RTU/SCADA | update settings on 7L84 relays for Telecom outage 2-76418 | 8.5 Hours
Continuous |
|
01-Dec-23 10:00 | 01-Dec-23 11:00 | ALTALINK | IO | 813L (L146s) CofL - Info | Solate DC source to test for ground fault, A and B protection | 60 Mins
Daily |
|
01-Dec-23 11:00 | 01-Dec-23 13:00 | ALTALINK | IO | 667L (L146s) CofL - Info | Solate DC source to test for ground fault, A and B protection | 2 Hours
Daily |
|
01-Dec-23 11:00 | 01-Dec-23 13:00 | ALTALINK | IO | 823L (L146s) CofL - Info | Solate DC source to test for ground fault, A and B protection | 2 Hours
Daily |
|
01-Dec-23 12:00 | 01-Dec-23 13:00 | ATCO | TE | ATCO Telecom Equipment, 722s RTU/SCADA (722s Crystal Lake), 7L39 (722s Crystal Lake - 7LA39 tap), 7L84 (722s Crystal Lake - 749s Flyingshot Lake), 7L68 (730s Rycroft - 811s Clairmont Lake) | outage on Crystal Lake telecom | 60 Mins
Continuous |
|
01-Dec-23 12:30 | 01-Dec-23 16:30 | ALTALINK | Outage | 658L (562s Cypress - 658AL tap), 658L (649s Chappice Lake - 658AL tap) | Close North jumpers at structure 286A. | 4 Hours
Daily |
This document and the information contained herein are based upon information and data which by their nature contain a degree of uncertainty and are subject to change. In addition, this document may contain information and data from public sources and/or third parties, which have been assumed to be accurate and complete and have not been verified. Accordingly, the Independent System Operator, operating as the Alberta Electric System Operator (the "AESO") makes no warranty, representation or guarantee, express or implied, with respect to this document or the information contained herein, including, but not limited to, any warranty, representation or guarantee of accuracy, completeness, timeliness, reliability, availability, absence of computer virus, non- infringement, merchantability or suitability for any purpose. Under no circumstances will the AESO, its members, officers, employees, contractors or agents, or any of their respective affiliates, be liable for any errors or omissions in, or any losses, damages or claims whatsoever, whether in contract, tort or otherwise, arising from use of or reliance upon, this document or any information contained herein. © 2009 Alberta Electric System Operator. All rights reserved |